EBT designed and delivered a stabilised piling and crane platform using site-won materials, meeting BR 470 & BR 475 standards. The solution reduced material imports, cut costs, and ensured safe, uninterrupted heavy plant operations.
Case Studies
Earthworks Stabilisation and Validation
For Curo’s high-profile film studio project, Envirobase provided independent validation of self-delivered stabilisation works. Through oversight, testing, and stakeholder collaboration, we ensured full compliance and delivered a robust final validation report.

Impermeable Soil Lining Below Water Table
When Agriplant Solutions needed an impermeable soil lining below the water table, Envirobase delivered. A bespoke blend and deep mixing transformed in-situ soils, achieving near-zero permeability, erosion resistance, and full compliance—without costly imports or liners.

Ground Stabilisation for Structural Foundation I…
When soft alluvium soils threatened to force costly piling, M&T turned to Envirobase Technologies. A tailored stabilisation blend and rigorous QA transformed the ground, enabling strip footings, cutting costs, and delivering a compliant, build-ready foundation.

Soil Reuse & Stabilisation for Section 278…
F1 Construction successfully maximised the reuse of existing site soils by stabilising them to meet Local Highways Authority requirements for Section 278 works. This approach achieved a zero cut/fill balance, reducing environmental impact and material costs while ensuring full compliance with highway standards.

The Construction of New Railway Link at Barking…
Design and construction of circa 8000m2 of haul road and 14000m2 of pile platform was in our scope of works to provide easily maintained and suitably tested access for all heavy plant such as piling rigs, 300T crawler cranes and PC Y beam delivery vehicle weighing circa 80T.